G.I.C. Group, Inc.
Got It Covered

Installation of PremierTuff 

After the sub-flooring has been properly prepared you may begin installing the floor.
  1. Unroll the PremierTuff Rolls in the room and let them sit for 48 hrs. This allows the rubber to do any expanding or contraction. 
  2. Using a utility knife, cut the rolls to fit required dimensions. 
  3. Once the rolls are cut spread the adhesive on the floor using a 1/16" trowel and lay the mats down, the seams should butt up together tightly to avoid gaps. 
  4. Once the floor is completed put 2'X4' weights, or 5 gallon buckets to adhere pressure to the floor.

**NOTE: If adhesive is spilled on face of PremierTuff Rolls wipe off with polyurethane thinner or acetone.

Maintenance 
For general cleaning use a shop-vac or broom to clean the mats. You can also use hot light soapy water with a sponge mop to clean the mats.
**DON'T EVER POUR WATER DIRECTLY ON THE MATS.
**NEVER USE HARSH CHEMICALS OR DETERGENTS ON THE MATS.


(5 year Warranty on Manufacturer Defects)

 

PO Box 519

Toll free: 877-638-7908

Phone: 503-662-5803
Yamhill, OR Fax: 503-662-5813
97148

Web Site: www.gic-group.com

e-mail: GICgroup@aol.com