Return to Product

Printer Friendly Version

Clicking here - will open a new window-select print from your browser to print the instructions

"Environmentally fit, economically priced"

PremierTuff 

Installation of Premier Tuff Rolls

After the sub-flooring has been properly prepared you may begin installing the floor.
  1. Unroll the PremierTuff Rolls in the room and let them sit for 48 hrs. This allows the rubber to do any expanding or contraction. 
  2. Using a utility knife, cut the rolls to fit required dimensions. 
  3. Once the rolls are cut spread the adhesive on the floor using a 1/16" trowel and lay the mats down, the seams should butt up together tightly to avoid gaps. 
  4. Once the floor is completed put 2'X4' weights, or 5 gallon buckets to adhere pressure to the floor.

**NOTE: If adhesive is spilled on face of PremierTuff Rolls wipe off with polyurethane thinner or acetone.

Maintenance 
For general cleaning use a shop-vac or broom to clean the mats. You can also use hot light soapy water with a sponge mop to clean the mats.
**DON'T EVER POUR WATER DIRECTLY ON THE MATS.
**NEVER USE HARSH CHEMICALS OR DETERGENTS ON THE MATS.


(5 year Warranty on Manufacturer Defects)

 

 

 

G.I.C. Group | 877-638-7908

Copyright @ 2002-2003.  All Rights Reserved