|
|
|
Return
to Product |
|
|
|
|
Printer Friendly Version |
|
Clicking
here - will open a new window-select print from
your browser to print the instructions
|
|
|
|
"Environmentally
fit, economically priced" |
|
PremierTuff |
|
|
Installation
of Premier Tuff Rolls
|
After the sub-flooring has been properly prepared you may begin installing the floor.
- Unroll the PremierTuff Rolls in the room and let them sit for 48 hrs. This allows the rubber to do any expanding or contraction.
- Using a utility knife, cut the rolls to fit required dimensions.
- Once the rolls are cut spread the adhesive on the floor
using a 1/16" trowel and lay the mats down, the seams should butt up together tightly to avoid gaps.
- Once the floor is completed put 2'X4' weights, or 5 gallon buckets to adhere pressure to the floor.
**NOTE: If adhesive is spilled on face of PremierTuff Rolls wipe off with polyurethane thinner or acetone.
Maintenance
For general cleaning use a shop-vac or broom to clean the mats. You can also use hot light soapy water with a sponge mop to clean the mats.
**DON'T EVER POUR WATER DIRECTLY ON THE MATS.
**NEVER USE HARSH CHEMICALS OR DETERGENTS ON THE MATS.
(5 year Warranty on Manufacturer Defects)
|
|
 |
|